Sustainable Management of Industrial Processes

Closing the Loop: An Integrated Circular Bioeconomy Model

For a mid-scale Italian craft brewery — circular valorisation of by-products, process integration, and resource efficiency.

Course
Sustainable Management of Industrial Processes
Institution
Politecnico di Milano

Alessandro
Gazzara

10673321

Elisa
Parini

10269547

Giacomo Enrico
Spada

10723760

Selma
Cerin

11193722

Index

  1. FASE 1

    Setting the Stage

    02 · 03 · 04 · 05

  2. FASE 2

    Methodology & Case

    06 · 07 · 08 · 09

  3. FASE 3

    Results

    10 · 11 · 12 · 13 · 14 · 15

  4. FASE 4

    Closing

    16 · 17 · 18 · 19 · 20

Circular Bioeconomy
May 2026
Politecnico di Milano
02
SMIP · Slide 2

Italian Mid-Scale,
the Lodi Context
& The Literature Gap

Why a 200,000 hL/y brewery in the Po Valley is the right unit of analysis — and what no peer-reviewed study has yet pieced together.

01

The Scale

Mid-Band Craft Brewery

200,000 hL / y

≈ 1.2% of national output — capital-intensive upgrades viable.

Micro Mid-Scale ★ Majors
National output 17.2 Mhl/y
Enterprises ~1,000 active breweries
Specific intensity High energy per hL — upgrade payback feasible
02

The Location

Lodi District · Po Valley

Lodi district livestock density and supply radius map
148 cattle / km²
15 km co-substrate radius
NVZ · 170 kg N/ha/y
Convergence: brewery + dairy partners + cereal suppliers within reach.
03

The Paradigm + Gap

Where the Literature Stops

Industrial Symbiosis · Chertow 2000

Physical proximity + complementary streams + stable contracts — the three pre-conditions for symbiosis are already in place in Lodi.

Gap · Research rationale

No peer-reviewed integrated case exists for a mid-scale Italian brewery combining in-house AD, CO₂ recovery and digestate-to-supplier fields.

★ This project is built to fill it.

FASE 1 — Setting the Stage · Context & Lit Gap
May 2026
Politecnico di Milano
03
SMIP · Slide 3

Problem framing · 03 / 19

The Linear Brewery — 3 Structural Inefficiencies

Three open loops · one convergent closing strategy

01  /  Low-Value By-Products

Low-Value
By-Products

  • 4,000 t/y wet BSG + yeast, trub, high-COD wastewater.
  • Sent to animal feed (fragile, 24–48 h decay) or sewer (high tariffs).

02  /  External Energy Dependency

External Energy
Dependency

  • 130–200 MJ/hL thermal & electrical demand.
  • ~26–40 TJ/year entirely purchased — grid + natural gas.

03  /  Open Material Flows

CO₂

Open
Material Flows

  • ~3–4 kg CO₂/hL vented — yet food-grade CO₂ is bought back.
  • Synthetic fertilizers on supplier fields, despite the NVZ cap (170 kg N/ha/y).
Takeaway

Structural, not managerial — three open loops, one convergent closing strategy.

Slide 4
FASE 1 — Setting the Stage · The Linear Brewery
May 2026
Politecnico di Milano
04
SMIP · Slide 4

Aim & Scope · 04 / 19

Research Question & 4 Objectives

Outputs of calculation · not declared targets
“

The Contract with the Audience

Can a mid-scale brewery solve the BSG problem, achieve energy efficiency, and close the nutrient loop — via in-house AD — delivering demonstrable long-term benefits?

Research Question Four objectives derived  →
O1 Planet Environment

Quantify Scenario B vs A

Across 6 LCA midpoint indicators — full cradle-to-gate inventory.

LCA · 6 midpoints
O2 Profit Economy

Compute NPV, IRR and Payback

Base vs PNRR incentive cases — investor-grade view.

NPV · IRR · Payback
O3 People Social

Partner farmers, jobs & replicability

Quantify farmer savings, rural employment, and district-level scalability.

S-LCA · Replicability
O4 Robust Sensitivity

Test against volatility

Sensitivity on NFRV, grid mix and energy price swings.

Sensitivity sweep
Synthesis Cost-Impact Quadrant Slide 5
FASE 1 — Setting the Stage · Objectives
May 2026
Politecnico di Milano
05
SMIP · Slide 5

Method & Boundaries · 05 / 19

Functional Unit, Boundaries
& LCA Method

✓

Compliance

ISO 14040 / 14044

System Boundary

Cradle-to-Gate · nutrient loop closed inside

Closed-loop diagram: barley fields → brewery → AD → CHP → digestate back to fields Barley / Hop Fields CHP · Electricity & Heat Loop: Digestate → Fields Brewery Operations · Analytical Core
Gate · 1 hL Beer
Analytical core Support components
Packaging (Excluded)

Functional Unit (FU)

1 hL of beer
at brewery gateBasis for all impact & cost normalisation

Software

openLCAv 2.7.5

Method

ReCiPe 2016Midpoint · Hierarchist (H)

Databases

BAFU 2025 RER · ELCD 3.2 IT-GridBioenergy + electricity mix references

Substitution

Energy → Grid / Gas  ·  Digestate → Synthetic N / P / K

FASE 1 — Setting the Stage · Method & Boundaries
May 2026
Politecnico di Milano
06
SMIP · Slide 6

Reference Case · 06 / 19

Case Study — 200k hL/y Lodi Reference Brewery

Scenario A — Baseline

Modelled Factsheet · Linear benchmark

Q1  / Scale & Context

Annual output

200,000 hL / year
Representative band  ·  District

Mid-scale craft · Lodi District, Po Valley

Reference Plant Isometric 3D rendering of the 200,000 hL/y Lodi reference brewery with PV panels, biogas tank and CHP

Brewery + Utilities + Biogas-to-CHP · physical anchor for Scenarios A & B

Q2  / Annual Inputs

Scenario A

  • Malt

    ~4,000 tCereal grist intake

    Raw
  • Hops

    ~80 tBittering & aroma additions

    Raw
  • Water

    ~130,000 m³Total intake · 6.5 L / L beer

    Intake
Q3  / Energy Baseline

100% bought

  • Thermal

    34 TJ / y100% Natural Gas

    NG
  • Electrical

    2.78 GWh / y100% Grid mix (IT-ELCD)

    Grid
Q4  / Waste & By-products

Linear destinations

  • BSG

    4,000 t→ Animal feed

    Feed
  • Wastewater

    100,000 m³→ Sewer / public WWTP

    Sewer
  • CO₂

    CO₂

    ~700 t→ Vented to atmosphere

    Vent
Goal

Transition from this linear benchmark to the integrated circular model — quantified in Scenario B.

A · B · Slide 7
FASE 2 — Methodology & Case · Reference Case
May 2026
Politecnico di Milano
07
SMIP · Slide 7

The Integrated System · 07 / 19

Six Engineered Components,
One Integrated Architecture

The Brewery sits at the centre; biogas from AD and UASB converges on the same CHP; digestate returns to the supplier fields.

Synoptic · Scenario B Integrated flow diagram of the brewery with AD, CHP, digestate management, PV, CO₂ recovery and UASB

Brewery 200,000 hL/y · AD-CSTR + UASB → same CHP · digestate → ~560 ha NVZ-compliant

Analytical Core

Full LCA + Economics

Quantitative
  • 01

    Anaerobic Digestion (AD)

    CSTR mesophilic (38 °C) · internal streams + cattle slurry.

  • 02

    CHP Unit

    Biogas → net electricity + heat for the brewery. No grid export.

  • 03

    Digestate Management

    Field injection → closes the nutrient loop on barley & hop suppliers.

Supporting

Tech-Economic Scoping

Co-benefits
  • a

    Rooftop PV & Heat Recovery

    Reduces the load on the CHP and valorises process waste heat.

  • b

    Fermentation CO₂ Capture

    Replaces external food-grade CO₂ purchases · surplus sold.

  • c

    UASB Pre-treatment

    High-rate anaerobic WW treatment · tail biogas to the same CHP.

Strategy

Quantitatively focus on the core, while scoping the systemic co-benefits of the support layer.

Slide 8 · Balances
FASE 2 — Methodology & Case · The Integrated System
May 2026
Politecnico di Milano
08
SMIP · Slide 8

Mass Balance · 08 / 19

Closing the Mass Balance

FU = 200k hL / y

Inbound Flow

01 · Annual feed

FU = 200k hL / y

  • Malt & Hops

    ~4,080 t / y

  • Water Intake

    ~130,000 m³ / y

  • Co-substrate · cattle slurry (local partners)

    20,000 t / y

Integrated mass-balance flow diagram of the brewery
02 ·

The 4 Closed Streams

Solid Waste · BSG, Yeast, Trub

24,800 t / y total AD feed

Co-digested with slurry.

Nutrients · Digestate (70/30 L/S)

23,750 t / y

Returned to supplier fields.

Wastewater

100,000 m³ / y

→ UASB pre-treatment (tail biogas to CHP).

CO₂

700 t / y · 85% captured

For internal carbonation / sale.

FASE 2 — Methodology & Case · Mass Balance
May 2026
Politecnico di Milano
09
SMIP · Slide 9

Energy Balance · 09 / 19

Demand vs. Integrated Supply · Annual net

Electrical

~96%

Result · Grid dependency nearly eliminated
Thermal

~27%

Result · Residual ~20 TJ/y on existing NG boilers
Scenario B · annual net Energy balance dashboard: thermal self-sufficiency 27% (Demand 34 TJ/y vs Supply 27.2 TJ/y) and electrical self-sufficiency 96% (Demand 2.78 GWh/y vs Supply 2.78 GWh/y)
Heat / Power ηth / ηel

CHP heat-to-power ratio ~1.2 vs. brewery thermal-heavy demand ~2.7 — the thermal gap is technology-limited, not design-limited.

The Gap Strategy Residual ~20 TJ/y · NG boilers
FASE 2 — Methodology & Case · Energy Balance
May 2026
Politecnico di Milano
10
SMIP · Slide 10

Planet · 10 / 19

GWP Waterfall · −15.8% carbon footprint

Δ GWP per hL

−3.23kg CO₂eq / hL

Beer produced · vs Scenario A
Total annual avoided

−646t CO₂eq / y

Scenario B vs A

A (20.45) → drivers → B (17.22) · kg CO₂eq / hL

Total Reduction Penalty
GWP waterfall: Scenario A 20.45 → CHP heat −2.7, Grid −0.7, Fertilizer −0.4, Transport +1.5 → Scenario B 17.22 kg CO₂eq/hL
CHP heat · replaces NG

−2.7 kg CO₂eq / hL

Grid substitution

−0.7 kg CO₂eq / hL

Fertilizer credit · N+P

−0.4 kg CO₂eq / hL

Penalty · 7.5 t lorry · 15 km

+1.5 kg CO₂eq / hL

CO ·

Co-benefits

  • −35%

    Midpoint indicator

    Fossil Resource Scarcity

    Avoided grid-mining & natural gas substitution.

  • −39%

    Midpoint indicator

    FW Eutrophication

    Avoided grid-mining & TSP fertilizer.

Anchor: equivalent to the annual emissions of ~400 Italian passenger cars.

≈ 400 cars / y
FASE 3 — Results · Planet Results
May 2026
Politecnico di Milano
11
SMIP · Slide 11

Planet · 11 / 19

LCA Robustness & Disclosed Trade-Offs

The climate benefit is sign-robust across all single-parameter tests — and the one penalty we surface is logistics, not agronomy.

A · Sensitivity Envelope · OAT Sign-robust
Δ GWP envelope
−10 % −21 %
Base case −15.8 % Δ GWP / hL
  • Envelope Δ GWP ranges from −10% to −21%.
  • Robustness The climate benefit is sign-robust across all single-parameter tests.
  • Top Technical Lever Digestate logistics · transport mode + distance.
B · Disclosed Trade-Off Terrestrial Ecotoxicity

+39 %

Current

→ Mitigation

+8 %

Mitigated

Current penalty +39 % Terrestrial ecotoxicity
  • The Driver Brake-wear emissions from the 7.5 t delivery lorry · +14.1 kg 1,4-DCB/hL.
  • The Reality A logistics impact, not an agronomic one — heavy metals from digestate remain flat between scenarios.
  • The Mitigation Switch to an agricultural tractor or reduce the radius to 5 km → drops the penalty to just +8%.
FASE 3 — Results · LCA Robustness & Trade-Offs
May 2026
Politecnico di Milano
12
SMIP · Slide 12

Profit · 12 / 19 · PNRR Scenario @ 10y

Financial Returns & Economic Sensitivity

NPV

+€1.4M

PNRR @ 10y
IRR

15.0%

vs Real WACC 7%
Payback

~5.2y

Discounted
A · Horizon & Scenario Check 3 Scenarios × 3 Horizons · NPV verdict
Scenario \ Horizon
6 y · Stress
10 y · Base
15 y · Full life
BaseNo support
Fail

−

Fast-payback stress
Marginal

−€0.3 M

NPV @ 10y
Pass

+€1.5 M

NPV @ 15y
PNRRWith grant
Fail

−

Honest stress test
Pass ★ Headline

+€1.4 M

IRR 15.0 % · PB 5.2 y
Pass

↑

Strong tail value
Realistic Opt.Co-benefits captured
Pass

✓

Pass across all horizons
Pass

✓

Pass across all horizons
Pass

✓

Pass across all horizons
B · Top 3 Drivers Contestable

BSG market dynamics

#1

Base assumes €0/t — local free exchange.

Public grant eligibility

#2

Tested 0% → 40% coverage.

Co-benefit capture

#3

Base captures 0% of partner savings.

C · NPV Sensitivity · 10y All drivers · € impact
NPV sensitivity tornado chart at 10y horizon showing all drivers (BSG, Public grant, CAPEX, Electricity tariff, Co-benefit, NG price, WACC) with failure-mode envelope
Conclusion

The Base case is deliberately conservative — that's what makes the PNRR pass robust.

FASE 3 — Results · Profit & Sensitivity
May 2026
Politecnico di Milano
13
SMIP · Slide 13

People · 13 / 19

Partner Avoided Cost, Employment & Avoided NH₃

The People pillar is concrete local value — a B2B partnership measured in €, FTE and kg NH₃.

Farmer
Co-Benefits

01 · Suppliers
~1,040 ha
Avoided synthetic fertilizer cost

€170k/ y

Full NPK · barley & hop suppliers
  • ~€164/ha direct savings on supplier fields.
  • 12–20 dairy farms secured via multi-year slurry-digestate exchange.
N-only · conservative ≈ €70k / y

Rural
Employment

02 · FTE per plant
Per installation
FTE created

1.5–1.9FTE

Direct + indirect per installation
  • 1.0 FTE direct on-site (AD/CHP operations).
  • ~0.9 FTE indirect in the supply chain.

Local Health
& Air Quality

03 · Avoided NH₃
Po Valley · PM2.5
Ammonia (NH₃) avoided

8–25t / y

Switch from surface-spreading to shallow injection
  • Direct lever on secondary PM2.5 precursors.
  • Measurable unit of policy leverage for the Po Valley.
Isometric view of three platforms (farms, brewery, residential health) linked to the central biogas plant
Significance

One installation = a measurable unit of policy leverage for Po Valley PM2.5 control.

FASE 3 — Results · People & Partners
May 2026
Politecnico di Milano
14
SMIP · Slide 14

TBL Synthesis · 14 / 19

Planet · Profit · People

The Triple Bottom Line at a glance — one metric, one result, one status per pillar.

🌍

Planet

Environmental

Metric

Climate Change (GWP)

Result

−15.8 %

−646 t CO₂eq / year avoided

Status

Robust 100% sign-robust in OAT sensitivity tests.
💶

Profit

Economic

Metric

NPV @ 10y · PNRR 40%

Result

+€1.4 M

IRR 15.0 % · Payback ~5.2 y

Status

Conditionally viable Requires horizon > 10y or Capex support.
🤝

People

Social

Metric

Farmer value & community health

Result

€170k · 1.9 FTE · −15 t NH₃

Per year · per installation

Status

High local leverage B2B partnership · Po Valley PM2.5 lever.
The Verdict

The integration resolves the linear bottleneck, creating a financially viable socio-environmental win under specific boundary conditions.

🌍 💶 🤝
FASE 3 — Results · TBL Summary
May 2026
Politecnico di Milano
15
SMIP · Slide 15

Synthesis · 15 / 19 · EAC Convention

Cost-Impact Quadrant · the Profit-Planet map

X · Cost Incremental annualized cost (€/hL)
Y · Climate Δ GWP vs baseline (kg CO₂eq/hL)
Scenario B · 10y cut
Cost-Impact quadrant chart showing Scenario A at origin and three Scenario B placements (PNRR, Base, Optimistic) with sensitivity ellipse around the PNRR dot
Scenario B placements · 10y Δ GWP = −3.23 kg / hL
  • PNRR · Headline

    Win-Win

    (−€1.00/hL · −3.23 kg)

    Both axes favourable — Win-Win quadrant.

  • Base · No Support

    Env-Win · Premium

    (+€0.21/hL · −3.23 kg)

    Environmental win at a small cost premium.

  • Realistic Optimistic

    Strong Win-Win

    (−€1.64/hL · −3.23 kg)

    Co-benefit capture pushes the dot deeper into Win-Win.

EAC Convention

NPV → annualised cost / hL — so €-axis & GWP-axis share the same denominator. The ellipse straddles the win-win boundary, combining LCA & economic sensitivity.

Verdict

Environmentally favourable across the full envelope; economic placement depends on public support. Either way, Scenario B is the structurally superior choice.

10–15 y horizon Structurally superior
FASE 3 — Results · Synthesis Quadrant
May 2026
Politecnico di Milano
16
SMIP · Slide 16

Closing · 16 / 19

Trade-offs & Limitations

The boundary conditions of the model — what holds, where, and why.

A · Technical / Environmental

Physical & ecological boundaries

01

The Thermodynamic Mismatch

CHP heat-to-power ratio ~1.2 vs. brewery thermal-heavy demand ~2.7 — fully covering electricity leaves ~73% of heat uncovered.

Heat / Power
CHP · 1.2
Demand · 2.7 → NG residual
ηth covered ~27% ~20 TJ/y on existing NG boilers
02

The Logistics-Ecotoxicity Link

The paradox: closing the local loop adds +39% Terrestrial Ecotoxicity via 7.5 t lorry brake-wear emissions.

+39% Terrestrial Ecotoxicity

Lesson: true sustainability needs short-radius supply chains (< 5 km) or electrified tractors.

B · Economic / Methodological

Financial & modelling boundaries

03

Economic Support Dependency

Base case requires a > 10-year horizon to break even — short-term viability (< 6y) is strictly tied to PNRR grants or capturing third-party co-benefits.

Horizon
< 6y · Fail
10y · PNRR pass
15y · Robust
Short-term Headline @ 10y Full life
04

Social Modelling Constraints

Employment impact (1.5–1.9 FTE) uses sector-level benchmarks — not site-specific surveys.

In scope Sector benchmarks · S-LCA proxies
Out of scope Biomethane-grade overhead costs
FASE 4 — Closing · Discussion & Limitations
May 2026
Politecnico di Milano
17
SMIP · Slide 17

Closing · 17 / 19 · Academic & practical contribution

Originality Claim — Gaps Closed & Open Horizons

✓ 4

Gaps Closed

○ 1

Frontier Open
A · The Contribution

4 Gaps Closed

  • Scale Specificity

    01

    First rigorous model tailored strictly to the Italian mid-scale band (200k hL/y) — bridging the gap between micro- and mega-scale literature.

  • Process Integration

    02

    Unified internal AD, high-rate UASB and fermentation CO₂ capture into a single, fully balanced thermodynamic circuit.

  • Territorial Grounding

    03

    Directly mapped to the Lodi Po Valley ecosystem, leveraging local co-substrates under strict NVZ regulations (170 kg N/ha/y).

  • Financial Realism

    04

    Transitioned from static payback to dynamic 10y / 15y horizons matching current PNRR capital funding frameworks.

B · The Frontier

1 Gap Left Open

Formal S-LCA

Local socio-economic indicators (FTE, fertilizer savings) are quantified, but a standardized, multi-stakeholder Social-LCA framework remains open for future academic expansion.

Future work → multi-stakeholder S-LCA
FASE 4 — Closing · Originality Claim
May 2026
Politecnico di Milano
18
SMIP · Slide 18

Closing · 18 / 19

Answer to the Research Question & SDG Alignment

The Research Question Can a mid-scale brewery solve the BSG problem, achieve energy efficiency, and close the nutrient loop — via in-house AD — delivering demonstrable benefits?
Answer

YES

Under disclosed conditions
01 · Loop Closed

Nutrients returned to fields

95 N · 28 P · 73 K

Tonnes / year (N + P + K) returned to supplier soils annually.

02 · Efficiency

Energy self-sufficiency

~96% el · ~27% th

Electrical & thermal · CHP + PV vs brewery demand.

03 · Environment

Climate footprint

−15.8% GWP

−646 t CO₂eq / y · sign-robust in OAT.

04 · Investment

Financial returns

NPV +€1.4 M

IRR 15.0% · Payback ~5.2y · PNRR @ 10y.

SDG Alignment

5 Goals
mapped to action

07

Produce

Affordable & Clean Energy

Renewable energy · CHP + PV
09

Retrofit

Industry & Infrastructure

Circular infrastructure
12

Valorise

Responsible Consumption

4 by-product streams
13

Substitute

Climate Action

−646 t CO₂eq / y
15

Return

Life on Land

Nutrients → supplier soils
FASE 4 — Closing · Answer & SDGs
May 2026
Politecnico di Milano
19
SMIP · Slide 19

Closing · 19 / 19

Conditions for Replicability & Future Work

The model holds only where five specific conditions intersect simultaneously — narrow by design.

A · Replicability Funnel

From 1,000 down to ~5–10 plants

Italy · Po Valley arc
0
Italian universe

~1,000 active breweries

Population
1
Scale band

100k–500k hL/y · CAPEX-viable mid-scale

Scale
2
Livestock density

≥ 100 cattle/km² · kinetic co-substrate

Livestock
3
Land + regulation

≥ 1,000 ha cereal land < 15 km · NVZ incentive

Land/Reg
4
Filiera fit

Malting barley & hops · N-window compatibility

Fit
★
Addressable population

~10 plants · Lombardia · Veneto · Emilia-Romagna

Strictly addressable
✕
Do not extrapolate

No micro-breweries, no non-cereal crops.

B · Future Work

The next steps

  • Empirical Validation

    Primary NFRV measurements + Monte Carlo propagation.

  • Full Social LCA

    From quantitative proxies to primary stakeholder data.

  • Biomethane Variant

    Upgrading + grid injection vs CHP — head-to-head LCA & econ.

Project Contribution

First integrated 4-stream quantification for the Italian mid-scale band.

SMIP · Closing the Loop
FASE 4 — Closing · Future Work
May 2026
Politecnico di Milano
20
SMIP · Slide 20

Closing the Loop

Thank&you

Questions, critiques, and next-step suggestions are welcome — every contribution sharpens the integrated circular model presented today.

Alessandro Gazzara

10673321

Elisa Parini

10269547

Giacomo Enrico Spada

10723760

Selma Cerin

11193722
SMIP · Politecnico di Milano · May 2026